(1) The Regional Load Despatch Centre shall be the apex body to ensure integrated operation of the power system in the concerned region.
(2) The Regional Load Despatch Centre shall comply with such principles, guidelines and
methodologies in respect of wheeling and optimum scheduling and despatch of electricity as the Central
Commission may specify in the Grid Code.
(3) The Regional Load Despatch Centre shall–
(a) be responsible for optimum scheduling and despatch of electricity within the region, in
accordance with the contracts entered into with the licensees or the generating companies operating in
the region;
(b) monitor grid operations;
(c) keep accounts of quantity of electricity transmitted through the regional grid;
(d) exercise supervision and control over the inter-State transmission system; and
(e) be responsible for carrying out real time operations for grid control and despatch of electricity
within the region through secure and economic operation of the regional grid in accordance with the
Grid Standards and the Grid Code.
(4) The Regional Load Despatch Centre may levy and collect such fee and charges from the
generating companies or licensees engaged in inter-State transmission of electricity as may be specified
by the Central Commission.
View Previous | View Next